Vint depth to Vint time

Top  Previous  Next

 

Interval velocity conversion from Depth domain to Time domain.

 

 

GnavPic_clip0291GnavPic_clip0301

 

The algorithm for converting interval velocity from the depth domain to the time domain is used to transform seismic wave velocity data, defined in the depth domain, into corresponding time values. It works by using the interval depth and velocity for each layer of the Earth's crust, calculating the time required for seismic waves to travel through those layers. The algorithm keeps the data in interval time format, which is crucial for seismic analysis and modeling in the time domain rather than the depth domain.

 

clip0306 clip0301

Input V depth - Input interval velocity (depth domain) gather uploaded into RAM.

 

clip0292clip0301

 Output time ratio - define a value of output sample interval (for Vint in time domain).

 

 Output time length - define a value of output trace length in m/s (for Vint in time domain).

 

 

 

GnavPic_clip0352GnavPic_clip0301

Execute on { CPU, GPU } - select which type of processor will be used for calculations: CPU or GPU.

 

Distributed execution - if enabled: calculation is on coalition server (distribution mode/parallel calculations).

 

Bulk size - chunk size is RAM in megabytes that is required for each machine on the server (find this information in the Information, also need to click on action menu button for getting this statistics):

 

Limit number of threads on nodes - limit numbers of threads on nodes for performing calculations.

 

Job suffix - add an job suffix.

 

Set custom affinity - an axillary option to set user defined affinity if necessary.

 

Affinity - add your affinity to recognize you workflow in the server QC interface.

 

Number of threads - limit number of threads on main machine.

 

Run scripts - it is possible to use user's scripts for execution any additional commands before and after workflow execution:

Script before run - path to ssh file and its name that will be executed before workflow calculation. For example, it can be a script that switch on and switch off remote server nodes (on Cloud).

Script after run - path to ssh file and its name that will be executed before workflow calculation.

 

Skip - switch-off this module (do not use in the workflow).

 

GnavPic_clip0307GnavPic_clip0301

Output V time - resulting interval velocity model in time domain.

 

 

clip0700_aGnavPic_clip0301

 

There is no information.

 

GnavPic_clip0353GnavPic_clip0301

There is no actions.

 

GnavPic_clip0293GnavPic_clip0301

There in an example for a workflow: read interval velocity via Read seismic traces and connect it to the Vint depth to Vint time module:

 

stretch_time_to_depth_04

 

Open visual vista items of input (interval depth domain) and output velocities (interval time domain):

stretch_time_to_depth_05

 

 

GnavPic_clip0305GnavPic_clip0301

YouTube video lesson, click here to open [VIDEO IN PROCESS...]

 

 

GnavPic_clip0431GnavPic_clip0301

 

 


 

GnavPic_clip0535 If you have any questions, please send an e-mail to: support@geomage.com